Brandy Hall Bridge, CastletownbereABM Bridge Systems brief was to widen the Brandy Hall Bridge in Castletownbere by 12.5 metres and construct a three-span arch to match the profile of the existing stone masonry arch structure. More > |
![]() |
M8 Glanmire to Watergrasshill, Co CorkThe construction of a 10 km stretch of the M8 Dual Carriageway from Glanmire to Watergrasshill was completed in September 2003 at a cost of €108 millio More > |
![]() |
Arches as Bridge and Tidal Structures - East Point Business Park, DublinWe offered the developers of a technology business park in Dublin a multi-cell precast arch solution for a bridge over a tidal river estuary as an alternative to a long-span bridge. More > |
![]() |
Matière wildlife arch, Haywards HeathThe banks of an ancient watercourse crossing the route of a new relief road in West Sussex, was the location of one of the first UK installations of the Matière CM4 system. More > |
![]() |
M6/M7 Kilcock to KinnegadConstruction work on the 40 km Kilcock to Kinnegad stretch of motorway began in 2003. More > |
![]() |
M1 Northern Motorway, Drogheda BypassABM Bridge System’s involvement in this project was to construct a railway over-bridge and motorway under-bridge at Lagavoren, a rural area situated just outside Drogheda town. More > |
![]() |
N11 MotorwayABM Bridge Systems involvement in this major infrastructural development necessitated the construction of a road over–bridge south of Rathnew village in Co Wicklow. More > |
The new intersection Stupava was opened to public on the first of August 2011. It is the crossing of the old D2 with the new constructed D4.
The rail bridge RB01, which carries the rail line over a local farm road, is in close proximity of the main structure on this section, the bridge across the Maritca river. The bridge RB01 is replacing an old existing bridge at the end of its lifecycle which was confirmed by several borehole drills samples tested in a laboratory.
continueThe road bridge carries over a 2nd class road over a double rail electrified track. The existing bridge structure was a three span bridge of precast pre-stressed beams of the length 30m sitting on in-situ columns.
continue