Download December 2009 Newsletter
Download June 2009 Newsletter
Download March 2009 Newsletter
Download November 2008 Newsletter
Download May 2008 Newsletter
Download project data sheet
Download project photos
Download project data sheet
Project Photos
Download project data sheet
Project Photos
Download project data sheet
Project Photos
The new intersection Stupava was opened to public on the first of August 2011. It is the crossing of the old D2 with the new constructed D4.
The rail bridge RB01, which carries the rail line over a local farm road, is in close proximity of the main structure on this section, the bridge across the Maritca river. The bridge RB01 is replacing an old existing bridge at the end of its lifecycle which was confirmed by several borehole drills samples tested in a laboratory.
continueThe road bridge carries over a 2nd class road over a double rail electrified track. The existing bridge structure was a three span bridge of precast pre-stressed beams of the length 30m sitting on in-situ columns.
continue