![]() |
Renault F1 CFD Facility, OxfordshireRenault F1 required a pre–-engineered solution for their new F1 CFD Test Facility that could be design approved, fabricated and installed within a brief prescribed time. More > |
![]() |
Bridge over the Birmingham CanalA Matière precast concrete arch from ABM Bridge Systems has been installed alongside a century old brick arch structure and an earlier Brindley designed bridge of 1772. More > |
![]() |
Porth Relief Road, Station Street BridgeThis project involved the replacement of an existing failed bridge structure with a new Matiere OptiCadre 12,5metre x 6 Metre precast buried concrete box structure. More > |
![]() |
M6/M7 Kilcock to KinnegadConstruction work on the 40 km Kilcock to Kinnegad stretch of motorway began in 2003. More > |
![]() |
M1 Northern Motorway, Drogheda BypassABM Bridge System’s involvement in this project was to construct a railway over-bridge and motorway under-bridge at Lagavoren, a rural area situated just outside Drogheda town. More > |
![]() |
N11 MotorwayABM Bridge Systems involvement in this major infrastructural development necessitated the construction of a road over–bridge south of Rathnew village in Co Wicklow. More > |
Rail line upgrade Žilina—Krasno nad Kysucou, 3 no. River Crossings
ABM are delighted that they have successfully installed their first bridges in Slovakia using Matière Opti-Cadre precast concrete portals.
The extension of a ski track OHDZ Grand—Brhliská, structure SO-07
ABM were recently called upon to participate in an urgent mission on the northern slope of the Chopok Mountain in the Low Tatras in Slovakia.
continueSkanska recently engaged ABM to fast-track installation works and obtain cost savings for a new railway bridge carrying a single-track railway from Štubňa to Prievidza over the new R3 expressway. The original proposal was based on an in-situ concrete abutment with a temporary steel bridge deck being used with a permanent deck of steel beams cast with a concrete infill. This involved long-term restrictions on traffic on the track and two full possessions.
continue