![]() |
Renault F1 CFD Facility, OxfordshireRenault F1 required a pre–-engineered solution for their new F1 CFD Test Facility that could be design approved, fabricated and installed within a brief prescribed time. More > |
![]() |
Bridge over the Birmingham CanalA Matière precast concrete arch from ABM Bridge Systems has been installed alongside a century old brick arch structure and an earlier Brindley designed bridge of 1772. More > |
![]() |
Porth Relief Road, Station Street BridgeThis project involved the replacement of an existing failed bridge structure with a new Matiere OptiCadre 12,5metre x 6 Metre precast buried concrete box structure. More > |
![]() |
M6/M7 Kilcock to KinnegadConstruction work on the 40 km Kilcock to Kinnegad stretch of motorway began in 2003. More > |
![]() |
M1 Northern Motorway, Drogheda BypassABM Bridge System’s involvement in this project was to construct a railway over-bridge and motorway under-bridge at Lagavoren, a rural area situated just outside Drogheda town. More > |
![]() |
N11 MotorwayABM Bridge Systems involvement in this major infrastructural development necessitated the construction of a road over–bridge south of Rathnew village in Co Wicklow. More > |
The new intersection Stupava was opened to public on the first of August 2011. It is the crossing of the old D2 with the new constructed D4.
The rail bridge RB01, which carries the rail line over a local farm road, is in close proximity of the main structure on this section, the bridge across the Maritca river. The bridge RB01 is replacing an old existing bridge at the end of its lifecycle which was confirmed by several borehole drills samples tested in a laboratory.
continueThe road bridge carries over a 2nd class road over a double rail electrified track. The existing bridge structure was a three span bridge of precast pre-stressed beams of the length 30m sitting on in-situ columns.
continue