Key Projects

Key Projects

    Renault F1 CFD Facility, Oxfordshire

    Renault F1 CFD Facility, Oxfordshire

    Renault F1 required a pre–-engineered solution for their new F1 CFD Test Facility that could be design approved, fabricated and installed within a brief prescribed time. 

    More >
    Bridge over the Birmingham Canal

    Bridge over the Birmingham Canal

    A Matière precast concrete arch from ABM Bridge Systems has been installed alongside a century old brick arch structure and an earlier Brindley designed bridge of 1772. 

    More >
    Porth Relief Road, Station Street Bridge

    Porth Relief Road, Station Street Bridge

    This project involved the replacement of an existing failed bridge structure with a new Matiere OptiCadre 12,5metre x 6 Metre precast buried concrete box structure. 

    More >
    M6/M7 Kilcock to Kinnegad

    M6/M7 Kilcock to Kinnegad

    Construction work on the 40 km Kilcock to Kinnegad stretch of motorway began in 2003. 

    More >
    M1 Northern Motorway, Drogheda Bypass

    M1 Northern Motorway, Drogheda Bypass

    ABM Bridge System’s involvement in this project was to construct a railway over-bridge and motorway under-bridge at Lagavoren, a rural area situated just outside Drogheda town.

    More >
    N11 Motorway

    N11 Motorway

    ABM Bridge Systems involvement in this major infrastructural development necessitated the construction of a road over–bridge south of Rathnew village in Co Wicklow.

    More >

Latest News

  • Welcome to the November edition of the ABM Bridge Systems Newsletter.
    continue
  • ABM receive a glowing commendation for M5 - Shore Road, Railway Structure in Northern Ireland.

    David M.Patton, Chairman of the Patton Group recently issued a terrific commendation to ABM Bridge Systems for their timely and successful completion of a Railway structure.

    continue
  • ABM receive a further commendation for the Park Bridge Arch Structure in Northern Ireland.

    ABM Bridge Systems have received a further commendation for their valiant efforts in delivering and installing the CM4 arch units for the Park Bridge Project, in Derry, on Friday 10th October 2008.

    continue
Company Reg. No. 224537design: www.principle.ie