Renault F1 CFD Facility, OxfordshireRenault F1 required a pre–-engineered solution for their new F1 CFD Test Facility that could be design approved, fabricated and installed within a brief prescribed time. More > |
![]() |
Bridge over the Birmingham CanalA Matière precast concrete arch from ABM Bridge Systems has been installed alongside a century old brick arch structure and an earlier Brindley designed bridge of 1772. More > |
![]() |
Porth Relief Road, Station Street BridgeThis project involved the replacement of an existing failed bridge structure with a new Matiere OptiCadre 12,5metre x 6 Metre precast buried concrete box structure. More > |
![]() |
M6/M7 Kilcock to KinnegadConstruction work on the 40 km Kilcock to Kinnegad stretch of motorway began in 2003. More > |
![]() |
M1 Northern Motorway, Drogheda BypassABM Bridge System’s involvement in this project was to construct a railway over-bridge and motorway under-bridge at Lagavoren, a rural area situated just outside Drogheda town. More > |
![]() |
N11 MotorwayABM Bridge Systems involvement in this major infrastructural development necessitated the construction of a road over–bridge south of Rathnew village in Co Wicklow. More > |
David M.Patton, Chairman of the Patton Group recently issued a terrific commendation to ABM Bridge Systems for their timely and successful completion of a Railway structure.
ABM Bridge Systems have received a further commendation for their valiant efforts in delivering and installing the CM4 arch units for the Park Bridge Project, in Derry, on Friday 10th October 2008.
continue