Rail line upgrade Žilina—Krasno nad Kysucou, 3 no. River Crossings
ABM are delighted that they have successfully installed their first bridges in Slovakia using Matière Opti-Cadre precast concrete portals.
The extension of a ski track OHDZ Grand—Brhliská, structure SO-07
ABM were recently called upon to participate in an urgent mission on the northern slope of the Chopok Mountain in the Low Tatras in Slovakia.
More >Skanska recently engaged ABM to fast-track installation works and obtain cost savings for a new railway bridge carrying a single-track railway from Štubňa to Prievidza over the new R3 expressway. The original proposal was based on an in-situ concrete abutment with a temporary steel bridge deck being used with a permanent deck of steel beams cast with a concrete infill. This involved long-term restrictions on traffic on the track and two full possessions.
More >Sisk Roadbridge Joint venture trading as SRB Civil Engineering Ltd signed a contract with Kilkenny County council for the construction of the N9/N10 Phase 4 Knocktopher to Powerstown high quality dual carriageway/motorway.
More >The A630 is a dual carriageway that connects Sheffield with the lifeblood of the north – the M1. Carrying 50,000 vehicles a day between the city and the motorway. Burrowed beneath the A360 was a vehicle underpass that fed local traffic within the Catcliffe, Brinsworth and Sheffield City Airport area.
More >This section of motorway is recently commenced construction and will significantly improve the highway network around Prague by connecting the D1 Motorway intersection in the east to the suburb of Jesenice in the west, where it connects with section 513 of the Prague Ring Road.
This section forms part of the south west segment of the motorway network under construction around Prague and is between the suburbs of Vestec and Lahovice.
More >ABM Bridge Systems has successfully installed the final of its underpass structures on the A3 Hindhead Bypass project.
More >ABM Bridge Systems were the suppliers to P.J. Hegarty & Sons, Cork, of a 14.5 m span x 6.0 m rise x 5.25 metre long, Matière Opti Cadre Portal Structure Supplied in 3 no. 1.75 m long units, for Irish Rail.
More >ABM Bridge Systems have received a number of commendations for their momentous efforts in delivering and installing the CM4 arch units for the Park Bridge Project, in Derry, on Friday 10th October 2008.
More >David M.Patton, Chairman of the Patton Group recently issued a terrific commendation to ABM Bridge Systems for their timely and successful completion of a Railway structure.
ABM Bridge Systems have received a further commendation for their valiant efforts in delivering and installing the CM4 arch units for the Park Bridge Project, in Derry, on Friday 10th October 2008.
More >On Friday 7th November ABM Bridge Systems’ project for the Renault Formula 1 Team scooped a major accolade for their design, supply and erection of a Matière CM4 25/225 x 65m Long precast structure used in the F1 Teams Computational Aerodynamic Research Centre’ or ‘CAR Centre’.
The N8 Cashel to Mitchelstown forms part of the South West Corridor that links Limerick and Cork to Dublin and is to be upgraded to dual carriageway/ motorway standard.
More >SIAC–Ferrovial JV, as part of the Eurolink Consortium, were the successful bidders on this PPP Motorway Scheme extending from the end of the existing Clonee bypass to the Meath/Cavan border.
This Design & Build scheme consists of the construction of 40 km of high quality dual carriageway.
More >Douglas Shopping Centre in Cork was the site for the installation of these specialised precast culvert units.
More >With berths for nearly 600 craft, the Mercia Marina near Derby will be one of the most prestigious pleasure craft developments in the country.
Welcome to ABM Bridge Systems latest Newsletter.
More >ABM Bridge Systems are very pleased to be involved with Brogan Construction on the replacement of the existing bridge structure over the Glenroan Burn River.
More >ABM Mosty, which represents ABM Bridge Systems in the Czech Republic, has commenced working on a large scale project for the Prague Ring Road - phase 513.
More >ABM Mosty, which represents ABM Bridge Systems in the Czech Republic, has successfully completed another structure for the Czech Rails - this time on the international corridor number 3.
More >As part of ABM Europe’s re–branding, ABM’s Civil Division, which up to now has been known as ABM Design & Build (Civils), has now been re–branded as ABM Bridge Systems.
More >The recently completed Renault F1 Team CFD centre structure at Enstone in Oxfordshire represents a unique application of ABM Bridge System’s Matiere CM4 Arch.
More >Rail line upgrade Žilina—Krasno nad Kysucou, 3 no. River Crossings
ABM are delighted that they have successfully installed their first bridges in Slovakia using Matière Opti-Cadre precast concrete portals.
The extension of a ski track OHDZ Grand—Brhliská, structure SO-07
ABM were recently called upon to participate in an urgent mission on the northern slope of the Chopok Mountain in the Low Tatras in Slovakia.
continueSkanska recently engaged ABM to fast-track installation works and obtain cost savings for a new railway bridge carrying a single-track railway from Štubňa to Prievidza over the new R3 expressway. The original proposal was based on an in-situ concrete abutment with a temporary steel bridge deck being used with a permanent deck of steel beams cast with a concrete infill. This involved long-term restrictions on traffic on the track and two full possessions.
continue