11/11/2008
David M.Patton, Chairman of the Patton Group recently issued a terrific commendation to ABM Bridge Systems for their timely and successful completion of a Railway structure. Under separate cover to our General Manager, Philip Weinmann he states,
“Hi Philip, Thank you once again for the excellent job you made of our M5 Railway Bridge. Your cooperation is much appreciated. We look forward to working with you again.
Regards David”
See attached commendation letter.
BACK TO NEWSThe new intersection Stupava was opened to public on the first of August 2011. It is the crossing of the old D2 with the new constructed D4.
The rail bridge RB01, which carries the rail line over a local farm road, is in close proximity of the main structure on this section, the bridge across the Maritca river. The bridge RB01 is replacing an old existing bridge at the end of its lifecycle which was confirmed by several borehole drills samples tested in a laboratory.
continueThe road bridge carries over a 2nd class road over a double rail electrified track. The existing bridge structure was a three span bridge of precast pre-stressed beams of the length 30m sitting on in-situ columns.
continue