M6/M7 Kilcock to KinnegadABM Bridge Systems won the contract for the construction of six bridges on this route. We designed and produced all six bridges in a period of just 12 weeks, with each bridge installation taking 3 days. More > |
![]() |
N5 Scramoge to Cloonmore, Co RoscommonThis project was commissioned by the rail transport division of Bord na Mona. It involved the construction of a bridge over a railway line that was in constant use. More > |
![]() |
UB 53 Erry Clara, Co OffalyABM Bridge Systems was contracted to carry a series of works improvements at various locations in counties Wicklow, Galway and Offaly. More > |
![]() |
River Lee crossing on N21/22ABM Bridge Systems was commissioned to install a precast Opti– Cadre portal frame with an 8.5 metre span to support a dual carriageway crossing on the River Lee. More > |
The new intersection Stupava was opened to public on the first of August 2011. It is the crossing of the old D2 with the new constructed D4.
The rail bridge RB01, which carries the rail line over a local farm road, is in close proximity of the main structure on this section, the bridge across the Maritca river. The bridge RB01 is replacing an old existing bridge at the end of its lifecycle which was confirmed by several borehole drills samples tested in a laboratory.
continueThe road bridge carries over a 2nd class road over a double rail electrified track. The existing bridge structure was a three span bridge of precast pre-stressed beams of the length 30m sitting on in-situ columns.