People

People

Our dymanic team of skilled specialist designers, engineers and skilled labour combine to bring a depth of experience and flair to the execution of large scale civil engineering projects.

One of the key ingredients in our success at winning high levels of repeat business is the calibre of our management team and other key staff. Their track records are different, but their driving force is the same – an unswerving commitment to speedy, reliable programme delivery.

ABM Bridge Systems Directors, Managers and Key Staff are:

Latest News

  • ABM Launch in Slovakia

    Rail line upgrade Žilina—Krasno nad Kysucou, 3 no. River Crossings
    ABM are delighted that they have successfully installed their first bridges in Slovakia using Matière Opti-Cadre precast concrete portals.

    continue
  • ABM Alpine Mission!

    The extension of a ski track OHDZ Grand—Brhliská, structure SO-07

    ABM were recently called upon to participate in an urgent mission on the northern slope of the Chopok Mountain in the Low Tatras in Slovakia.

    continue
  • R3 Horna Štubňa—Bypass, new railway bridge SO201–00

    Skanska recently engaged ABM to fast-track installation works and obtain cost savings for a new railway bridge carrying a single-track railway from Štubňa to Prievidza over the new R3 expressway. The original proposal was based on an in-situ concrete abutment with a temporary steel bridge deck being used with a permanent deck of steel beams cast with a concrete infill. This involved long-term restrictions on traffic on the track and two full possessions. 

    continue
Company Reg. No. 224537design: www.principle.ie