Our dymanic team of skilled specialist designers, engineers and skilled labour combine to bring a depth of experience and flair to the execution of large scale civil engineering projects.
One of the key ingredients in our success at winning high levels of repeat business is the calibre of our management team and other key staff. Their track records are different, but their driving force is the same – an unswerving commitment to speedy, reliable programme delivery.
ABM Bridge Systems Directors, Managers and Key Staff are:
The new intersection Stupava was opened to public on the first of August 2011. It is the crossing of the old D2 with the new constructed D4.
The rail bridge RB01, which carries the rail line over a local farm road, is in close proximity of the main structure on this section, the bridge across the Maritca river. The bridge RB01 is replacing an old existing bridge at the end of its lifecycle which was confirmed by several borehole drills samples tested in a laboratory.
continueThe road bridge carries over a 2nd class road over a double rail electrified track. The existing bridge structure was a three span bridge of precast pre-stressed beams of the length 30m sitting on in-situ columns.
continue