Associate and General Manager
Philip Weinmann heads ABM Bridge Systems and Mosty Divisions from our Headquarters in Dublin. He is a Chartered Structural Engineer, graduating from Bolton St., College of Technology and has, since 1992, gained extensive experience both with consulting engineers and contracting organisations in the construction industry.
Since joining ABM Bridge Systems in 2000, he has spearheaded the development and growth of the Bridge System and Mosty Divisions which are now firmly established within their regions.
Philip is an enthusiastic and highly experienced Associate & General Manager who commits his energies wholeheartedly to the success of ABM Bridge Systems.
The new intersection Stupava was opened to public on the first of August 2011. It is the crossing of the old D2 with the new constructed D4.
The rail bridge RB01, which carries the rail line over a local farm road, is in close proximity of the main structure on this section, the bridge across the Maritca river. The bridge RB01 is replacing an old existing bridge at the end of its lifecycle which was confirmed by several borehole drills samples tested in a laboratory.
continueThe road bridge carries over a 2nd class road over a double rail electrified track. The existing bridge structure was a three span bridge of precast pre-stressed beams of the length 30m sitting on in-situ columns.
continue