Client: Westmeath County Council
Project: M6/M7 Kilcock to Kinnegad

Construction work on the 40 km Kilcock to Kinnegad stretch of motorway began in 2003. This €420 million public private partnership (PPP) project is being managed by the National Roads Authority as part of the €6 billion National Development Plan. ABM Bridge Systems won the contract for the construction of six bridges on this route.

We designed and produced all six bridges in a period of just 12 weeks, with each bridge installation taking three days.

Key aspects of this project included the construction of two separate arch structures – one supporting the Galway-bound section of the motorway and the other the Sligo – bound section of the motorway –– comprising precast spandrel walls and wing walls with
feature finish.

The erection of the precast frame took two days. This short timeframe, combined with the fact that Opti Cadre underpass structures were used, enabled the main contractor to keep the road operational during the entire construction process.

Download project data sheet

BACK TO PROJECTS

Latest News

  • Intersection Stupava - South, Highway D2xD4

    The new intersection Stupava was opened to public on the first of August 2011. It is the crossing of the old D2 with the new constructed D4.

    continue
  • Rail Bridge Structure RB01 Svilengrad, Bulgaria

    The rail bridge RB01, which carries the rail line over a local farm road, is in close proximity of the main structure on this section, the bridge across the Maritca river. The bridge RB01 is replacing an old existing bridge at the end of its lifecycle which was confirmed by several borehole drills samples tested in a laboratory. 

    continue
  • Refurbishment of a road bridge Vyskov

    The road bridge carries over a 2nd class road over a double rail electrified track. The existing bridge structure was a three span bridge of precast pre-stressed beams of the length 30m sitting on in-situ columns.

    continue
Company Reg. No. 224537design: www.principle.ie