Client: Bord na Mona
Project: N5 Scramoge to Cloonmore, Co Roscommon
This project was commissioned by the rail transport division of Bord na Mona. It involved the construction of a bridge over a railway line that was in constant use. One of the key challenges that we faced was how to configure our design in such a way as to minimise the undermining of the track. We completed the installation of this bridge in two days using precast wing walls and an Opti Cadre portal frame.
Rail line upgrade Žilina—Krasno nad Kysucou, 3 no. River Crossings
ABM are delighted that they have successfully installed their first bridges in Slovakia using Matière Opti-Cadre precast concrete portals.
The extension of a ski track OHDZ Grand—Brhliská, structure SO-07
ABM were recently called upon to participate in an urgent mission on the northern slope of the Chopok Mountain in the Low Tatras in Slovakia.
continueSkanska recently engaged ABM to fast-track installation works and obtain cost savings for a new railway bridge carrying a single-track railway from Štubňa to Prievidza over the new R3 expressway. The original proposal was based on an in-situ concrete abutment with a temporary steel bridge deck being used with a permanent deck of steel beams cast with a concrete infill. This involved long-term restrictions on traffic on the track and two full possessions.
continue