Client: Irish Rail
Project: UB241 Wexford to Rosslare

The under–bridge constructed by ABM Bridge Systems replaced a bridge that was in need of immediate repair. Due to the high activity on the route, it was not possible to put the track out of commission for long periods of time while construction work was underway. For this reason, ABM had to build a number of the key structural components off site.

It took just three days to demolish the old bridge and install the new precast structure, which was a customised version of the Opti–Cadre portal configuration. It was designed in such a way as to ensure that upper element units formed the bridge deck. These were in turn supported on precast stretcher beams.
As a result of this approach, we were able to install the precast structure on each side of the rail embankment using pile–cap foundations, which had been constructed off–site in advance of the operation.

BACK TO PROJECTS

Latest News

  • The gateway to boating leisure

    With berths for nearly 600 craft, the Mercia Marina near Derby will be one of the most prestigious pleasure craft developments in the country.

    continue
  • ABM Bridge Systems latest Newsletter.

    Welcome to ABM Bridge Systems latest Newsletter. 

    continue
  • ABM Bridge Systems are very pleased to be involved with Brogan Construction

    ABM Bridge Systems are very pleased to be involved with Brogan Construction on the replacement of the existing bridge structure over the Glenroan Burn River. 

    continue
Company Reg. No. 224537design: www.principle.ie