Client: Irish Rail
Project: UB 53 Erry Clara, Co Offaly
As part of Irish Rail’s nationwide programme of upgrading its network of level crossings, ABM Bridge Systems was contracted to carry a series of works improvements at various locations in counties Wicklow, Galway and Offaly. One of the largest construction projects in the overall Irish Rail programme was the UB 53 Erry Clara Underpass: this was designed to provide road access for local residents.
Because it was not possible to close the railway line at Erry Clara for long periods, we had just a short time frame available in which to carry out the installation, an Opti–Cadre precast box structure, and replace the level crossing. From start to finish, this work took just one weekend.
Rail line upgrade Žilina—Krasno nad Kysucou, 3 no. River Crossings
ABM are delighted that they have successfully installed their first bridges in Slovakia using Matière Opti-Cadre precast concrete portals.
The extension of a ski track OHDZ Grand—Brhliská, structure SO-07
ABM were recently called upon to participate in an urgent mission on the northern slope of the Chopok Mountain in the Low Tatras in Slovakia.
continueSkanska recently engaged ABM to fast-track installation works and obtain cost savings for a new railway bridge carrying a single-track railway from Štubňa to Prievidza over the new R3 expressway. The original proposal was based on an in-situ concrete abutment with a temporary steel bridge deck being used with a permanent deck of steel beams cast with a concrete infill. This involved long-term restrictions on traffic on the track and two full possessions.