Almost uniquely among construction companies of our size, we have invested heavily in the most advanced structural and architectural design technology and computer software. Our team of in-house engineers and design professionals use software packages such as complete AutoCad2005 (including Architectural Desktop); MathCAD; Robot Millennium V.17, and Visual Basic for Application, as well as a range of other design capabilities, to create innovative bridge structures.
All ABM personnel have access to the company‘s broadband telephone system. As a result, our engineers and other site personnel can use their laptops to download and print drawings, graphics and designs within seconds – even when working at a remote location.
The new intersection Stupava was opened to public on the first of August 2011. It is the crossing of the old D2 with the new constructed D4.
The rail bridge RB01, which carries the rail line over a local farm road, is in close proximity of the main structure on this section, the bridge across the Maritca river. The bridge RB01 is replacing an old existing bridge at the end of its lifecycle which was confirmed by several borehole drills samples tested in a laboratory.
continueThe road bridge carries over a 2nd class road over a double rail electrified track. The existing bridge structure was a three span bridge of precast pre-stressed beams of the length 30m sitting on in-situ columns.
continue