Client: Belgard Motors
Project: Belgard Motors, Tallaght, Dublin 24
Value:Value: €2.9 Million
Stage Completed:Stage Completed: October 2000
Design Team:Design Team:
Ryan O’Brien Handy
Donnelly Troy
David Turner
ABM Construction undertook the complete refurbishment and rebuilding of this large and well known motor dealership on the Belgard Road, in Tallaght, Dublin 24.
The completed project includes showrooms and offices to serve a number of different car marques, including Mercedes Benz, Mazda, Volkswagen and Audi.
All internal finishes were to a very high standard with stainless steel curved staircases, mosaic tiled floors and a generous use of glazing. The size of this project was 3,600m2 and took 12 months for completion.
As part of our ongoing Continuous Improvement Strategy, ABM have successfully undertaken and achieved accreditation for ISO14001 (environmental) and OHSAS18001 (Health & Safety) to add to our previously accredited ISO9001 Quality Management System.
continueABM have commenced a social housing project at Gloucester Street in Dublin. The project, for National Association of Building Co-Operatives (NABCO) Society Ltd, consists of the construction of 19 cooperative social housing units in three, four and five storey buildings together with a self contained 30m2 committee room all of which are being erected on an existing sub structure forming part of a basement car-park over the whole area of the site.
continueABM have commenced on-site with 3 no. Design & Build/Rapid Build Schools for the DoES. The schools, based in Drogheda, Newbridge and Galway were secured against strong competition. ABM’s vast experience in the educational sector and success in completing 3 previous Rapid Build Schools for the DoES at Rochestown, Athy and Kellystown, along with realistic programming and pricing strategies secured them these much sought after projects.
continue