Client: Bryan Cullen / Castlethorn Developments
Project: Dundrum Apartments / ESB Substation, Dundrum Gate, Ballinteer Road, Dundrum, Dublin 14
Value: €12.2 Million
Stage Completed: June 2003
Design Team:
DBFL Engineering
Frank Elmes & Co. Architects
This project, completed in 2003 consisted of the construction of 63 high specification apartment units, in 3 separate blocks, size, 5,200m2. At the outset, ABM facilitated an archaeological dig on the site, as it is immediately adjacent to the historic Dundrum Castle. The development is constructed on a steep embankment beside the Dundrum Bypass across the road from the new Dundrum Shopping Centre. ABM carried out some slope stabilization work to ensure the safety of the new construction. The project duration was 12 months and construction was fast-tracked due to the archaeological and site issues mentioned above.
Located on the existing site of a derelict 19th Century British Army Barracks, ABM is currently undertaking enabling works in preparation for future refurbishment works which are planned for the historic barracks building.
ABM has recently completed 2 no. Community Nursing Units. The 100-bed Clonskeagh development consisted of the demolition of two existing single-storey buildings and the construction of a community nursing unit at the south western corner of the site.
continueABM has acquired contracting firm E Ratcliffe, based in St. Helens, on the strategically important Liverpool-Manchester corridor. ABM’s Continuous Development Strategy, coupled with our many years experience in the international construction sector, enables us to recognise a niche in the market and establish a presence with ease.