Projects

Client: John Moran
Project: Holiday Inn–hotel extension, Pearse Street, Dublin 2

Value: €1.4 Million
Stage Completed: July 2004
Design Team:
OMS Architects
Duffy Gaffney–QS
OCSC Engineers

The works consists of an extension to the existing Holiday Inn and alterations to 3 No. existing Hotel bedrooms and fire escape staircase, including siteworks and drainage.  The works also includes 2 No. Apartments and retail space on the ground floor including a basement for storage.

BACK TO PROJECTS

Latest News

  • ABM Achieves ISO14001 & OHSAS18001 Accreditation

    As part of our ongoing Continuous Improvement Strategy, ABM have successfully undertaken and achieved accreditation for ISO14001 (environmental) and OHSAS18001 (Health & Safety) to add to our previously accredited ISO9001 Quality Management System.

    continue
  • ABM Commences Social Housing Project in Gloucester Street

    ABM have commenced a social housing project at Gloucester Street in Dublin. The project, for National Association of Building Co-Operatives (NABCO) Society Ltd, consists of the construction of 19 cooperative social housing units in three, four and five storey buildings together with a self contained 30m2 committee room all of which are being erected on an existing sub structure forming part of a basement car-park over the whole area of the site. 

    continue
  • ABM Commences Tranche 1a Rapid Build Schools

    ABM have commenced on-site with 3 no. Design & Build/Rapid Build Schools for the DoES. The schools, based in Drogheda, Newbridge and Galway were secured against strong competition. ABM’s vast experience in the educational sector and success in completing 3 previous Rapid Build Schools for the DoES at Rochestown, Athy and Kellystown, along with realistic programming and pricing strategies secured them these much sought after projects.

    continue
Company Reg. No. 224537design: www.principle.ie