Client: Wheatfield Developments Ltd
Project: Blanchardstown Corporate Park, Phase 2, Site 8, Blanchardstown, Dublin 15
Value: €6 Million
Stage Completed: November 2001
Design Team:
ABM Design + Build t/a ABM Construction Ltd
This 70,000 sq ft (6,500 m2), 16-unit own-door office complex was designed and built by ABM Construction at a cost of €5 million, to a high level of specification.
The ‘own door’ units range in size between 2,885 sq ft and 6,000 sq ft (i.e. from 268 sq m to 557 sq m). Each is fitted with Cat 5 computer cabling, and offers easy access to the T50 and North Western Digital Corridor fibre optic networks.
Common features in all units include a tea station, audio intercom entry system, burglar alarm system, gas fired central heating, and carpeting throughout.
Design features include cherry wood veneer entrance doors, white oak veneer internal doors with chrome door handles. Windows are double glazed. Down lighting is installed throughout.
On–site facilities include a creche, restaurant, convenience store and ATM.
Located on the existing site of a derelict 19th Century British Army Barracks, ABM is currently undertaking enabling works in preparation for future refurbishment works which are planned for the historic barracks building.
ABM has recently completed 2 no. Community Nursing Units. The 100-bed Clonskeagh development consisted of the demolition of two existing single-storey buildings and the construction of a community nursing unit at the south western corner of the site.