Almost uniquely among construction companies of our size, we have invested heavily in the most advanced structural and architectural design technology and computer software. Our team of in-house engineers and design professionals use software packages such as complete AutoCad2005 (including Architectural Desktop); MathCAD; Robot Millennium V.17, and Visual Basic for Application, as well as a range of other design capabilities, to create innovative bridge structures.
All ABM personnel have access to the company‘s broadband telephone system. As a result, our engineers and other site personnel can use their laptops to download and print drawings, graphics and designs within seconds – even when working at a remote location.
On Friday 7th November ABM Bridge Systems’ project for the Renault Formula 1 Team scooped a major accolade for their design, supply and erection of a Matière CM4 25/225 x 65m Long precast structure used in the F1 Teams Computational Aerodynamic Research Centre’ or ‘CAR Centre’.
Pupils at the new Scoil Choilm Community National School, Porterstown Road, Kellystown, Dublin 15, entered their gleaming new classrooms on Monday last (September 1st 2008) just 14 weeks from the date of the pouring of the ground floor slab back in May.
continueThe Board of ABM Construction is delighted to welcome Joe Savage as General Manager of the ABM Construction/Design & Build Division.
continue