![]() |
Tytherington Railway Bridge Replacement, SomersetWith strengthening not being a viable option for upgrading this overbridge, Network Rail chose a complete replacement. Limitation on railway possession and the need to maintain road access called for a complete precast solution to be selected. More > |
SSN Viaduct, HMNS FaslaneABM Precast Solutions will shortly begin shipment of 66 28m long ‘hybrid’ bridge beams to the submarine base at Faslane near Glasgow. More > | |
As part of ABM’s re–branding, the UK based precast concrete operation formerly know as ABM Precon Ltd., is being re-launched as ABM Precast Solutions Ltd.
continueWork is currently underway to reinstate the link between the Ffestiniog and Welsh Highland Railways and bring steam trains back to tracks which closed in the 1930s.
continueDeliveries of 27 metre long, 32 tonne pre–stressed bridge beams to HMNB at Faslane from ABM Precast Solution’s North Nottinghamshire plant began during March 2008.
continue