Client: Veolia Water Solutions & Technologies
Project: Biostyr BAFF Waste Water Treatment Panels
Each precast panel has over 300 filter nozzle tubes cast in to it, this combined with the complex reinforcement required to withstand the uplift on the slabs in the process led to an innovative use of both tooling and materials.
The complex shape and high surface finish demands required the use of specially designed, steel, vertical casting cells and an individually formulated self compacting concrete mix capable of fully filling the required shape without the need for manual finishing.
Waste water treatment plants at Wigan and Blackburn are being supplied with these panels with wider use of the system planned.
One of the country’s fastest moving road construction projects is underway on the A46 east of Nottingham, with 28km of dual carriageway being constructed to improve the route from Newark to Widmerpool.
continueIn recent months several of the largest precast components manufactured at our Tuxford site have been delivered to sites across the country.
continueAs our production for the civil engineering industry brings bigger challenges, ABM Precast Solutions have also recently started production of post support blocks for easi-edge’s ‘hoard-it’ system.
continue