2016 Feb - D2 Green Bridge, SK

ABM Mosty has installed a new twin span arch over a busy motorway in Slovakia. The bridge reconnects the Alps and Carpathian Mountains allowing for the large wild animals as deer, brow bear or lynx to safely migrate between the two territories thus maintain their genome diversity.

The total length of the structure is 112,5m. The structure has been installed in two phases so not to disturb the heavy traffic. The job was completely finished in February 2016.

short news from local TV - https://youtu.be/zVG8D067Wrc

 

 
Key Personnel

Main Board Directors
Pat O'Neill
Sean Minihane
Brendan O'Neill

Sustainability

ABM Europe is wholly committed to the concept of sustainability throughout all aspects of the business through the implementation of environmental...

Our Mission & Vision

ABM’s mission is to deliver exceptional quality structures, buildings and products on a continual basis that exceed our clients’ expectations...