C4950 - Port Talbot

Project C4950 - Port Talbot
Client Neath Port Talbot Borough Council
Stage Complete
Location Port Talbot, South Wales

Products Supplied

Description Quantity Weight
26.75m long M Beam 126 32 tonnes each unit
26.75m long UM Beam 2 38 tonnes each unit

Project Details

The £107 million 'Harbour Way' road link forms the final stage of the Port Talbot Peripheral distributor Road and will complete the area's link with the M4. The route, through a busy industrial and urban landscape crosses the main South Wales Coastal Railway at a considerable skew, resulting in a 140m long tunnel/bridge crossing with a deck formed from ABM prestressed M10 beams with UM10 beams at the portal.

 
Key Personnel

Main Board Directors
Pat O'Neill
Sean Minihane
Brendan O'Neill

Sustainability

ABM Europe is wholly committed to the concept of sustainability throughout all aspects of the business through the implementation of environmental...

Our Mission & Vision

ABM’s mission is to deliver exceptional quality structures, buildings and products on a continual basis that exceed our clients’ expectations...