Client Network Rail
Stage Complete
Location Willington, Burton on Trent, Derbyshire

Products Supplied

Description Quantity Weight
RC Cill BeamX 2 34.3
RC Ballast Wall Type 1 2 15.7
RC Ballast Wall Type 1 2 17.6
Steel Bridge Deck 2 20.7

Project Details

Working closely with ABM the main contractor on the replacement of the Egginton Brook Underbridge near Derby overcame significant logistical challenges. The fabricated steel work for the composite steel/concrete ‘U’ deck units was delivered to ABM’s Tuxford works where the manufacture of the precast components and deck ‘in-fill’ works were carried out, with the whole structure being trial erected, water-proofed and client inspected before dismantling for delivery to site by road. The close co-operation of ABM with the contractor, designer, client and other suppliers resulted in a smooth an efficient bridge replacement in a single weekend.

 
Key Personnel

Main Board Directors
Pat O'Neill
Sean Minihane
Brendan O'Neill

Sustainability

ABM Europe is wholly committed to the concept of sustainability throughout all aspects of the business through the implementation of environmental...

Our Mission & Vision

ABM’s mission is to deliver exceptional quality structures, buildings and products on a continual basis that exceed our clients’ expectations...