C5472 - Farndon Underpass

Project C5472 - Farndon Underpass
Client Highways Agency
Stage Complete
Location A46, Newark By-pass, Farndon, Newark

Products Supplied

Description Quantity Weight
RC Lower Element 24 4.6 tonnes (each unit)
RC Upper Element K1 10 18.6 tonnes (each unit)
Opti-Cadre Edge Beam (R1&R3) 2 9.1 tonnes (each unit)
Opti-Cadre Edge Beam (R2&R4) 2 7.8 tonnes (each unit)
RC Wingwall (S1&S4) 4 7.1 tonnes (each unit)
RC Wingwall (S2&S5) 4 6.8 tonnes (each unit)
RC Wingwall (S5&S6) 4 6.1 tonnes (each unit)

Project Details

As part of the A46 Newark to Widmerpool improvement scheme, the Farndon Underpass provides an essential link beneath the busy Newark By-pass at the north of the scheme. The need to maintain high traffic volumes whilst constructing the improved junction led ECI contractor Balfour Beatty to again take advantage of the speed and flexibility of construction of the Opti-Cadre precast buried portal frame system. The sectional underpass, parapet beams and wingwalls were erected in two phases with only minimal effect on traffic.

 
Key Personnel

Main Board Directors
Pat O'Neill
Sean Minihane
Brendan O'Neill

Sustainability

ABM Europe is wholly committed to the concept of sustainability throughout all aspects of the business through the implementation of environmental...

Our Mission & Vision

ABM’s mission is to deliver exceptional quality structures, buildings and products on a continual basis that exceed our clients’ expectations...