I/50 Handlova Centre Bypass, Bridge SO201-10

Project I/50 Handlova Centre Bypass, Bridge SO201-10
Client SSC Bratislava, IvaSC Zilina
Stage Complete
Description Construction of the only bridge on the 541m long bypass of the city centre

Fact File

Structure Precast Box Structure OC 5,0m x 2,6
Span 5,0m (clear)
Height 2,6m (clear)
Length 55m

Requirements

  • The need for rapid installation with minimal impact on site in relation to pollution (south and dust) to nearby housing zone.
  • Lowering risks in comparison with in-situ procedures and installation during the Winter period.
  • A complex solution was required which included detail in relation to wingwalls and edge beams

Solution

  • A precast ABM system was installed onto an in-situ foundation deck.
  • Precast wingwalls and edge beams were used to maximise the speed of construction.
  • 4 no. openings with a diameter of 600mm were incorporated into the structure to allow for the connection of local drains.
  • Installation took place in two phases in order to allow co-ordination with the site processes.

Click here to view a YouTube video of how ABM construct a bridge in 3 days

 
Key Personnel

Main Board Directors
Pat O'Neill
Sean Minihane
Brendan O'Neill

Sustainability

ABM Europe is wholly committed to the concept of sustainability throughout all aspects of the business through the implementation of environmental...

Our Mission & Vision

ABM’s mission is to deliver exceptional quality structures, buildings and products on a continual basis that exceed our clients’ expectations...