Haywards Heath Wildlife Arch

Project Matiere Wildlife Arch
Client West Sussex County Council
Stage Complete
Description Design and construction of arch over stream

Fact File

Structure Matière CM4 40m²/40m² sectional precast concrete arch
Span 8.5m (internal)
Height 6.0m (internal)
Length 75.0m (30 no. Units @ 2.5m wide)

Requirements

  • Arch over ancient water course.
  • No disturbance to water course or water banks.
  • Minimal impact to surrounding area.

Solution

  • ABM design allowed the water course and banks to remain completely untouched.
  • Installation of arch took 3 days.
  • ABM design eliminates the need for substantial foundations.

The Matiére system was originally developed in France for hydraulic structures in the 1980‘s, since then the system has been developed into a modular range of arch, box and portal frames for a wide range of transport and infrastucture applications. Indeed, some 10,000 structures already exsist worldwide exploiting soil structure interaction to minimise section sizes and allow rapid, cost effective on-site installation with precast units.

ABM hold the licence for the Matiére system in the UK and Ireland.

Click here to view a YouTube video of how ABM construct a bridge in 3 days

 

 
Key Personnel

Main Board Directors
Pat O'Neill
Sean Minihane
Brendan O'Neill

Sustainability

ABM Europe is wholly committed to the concept of sustainability throughout all aspects of the business through the implementation of environmental...

Our Mission & Vision

ABM’s mission is to deliver exceptional quality structures, buildings and products on a continual basis that exceed our clients’ expectations...