Port Relief Road, Station Street Bridge

Project Port Relief Road, Station Street Bridge
Client Rhondda Cynon TAF
Stage Complete
Description Replacement of an existing failed bridge structure with Matière Opti-Cadre 12.5mx6.0m

Fact File

Structure Matière Opti-Cadre 12.5m x 6.0m precast buried concrete box.
Span 12.5m (internal)
Height 6.00m (internal)
Length 12.26m (7 no. Units @ 1.75m wide)

Requirements

  • Replacement of existing failed bridge
  • Reduce cost and construction time
  • Complex and intricate installation process

Solution

  • 12.5m x 6.0m Precast buried concrete box structure.
  • Highly skilled in-house construction team to lift heavy components around intricate and complex temporary propping system.
  • Retaining wing walls extending on four sides up to 38m in length

The Matiére system was originally developed in France for hydraulic structures in the 1980's, since then the system has been developed into a modular range of arch, box and portal frames for a wide range of transport and infrastucture applications. Indeed, some 10,000 structures already exsist worldwide exploiting soil structure interaction to minimise section sizes and allow rapid, cost effective on-site installation with precast units.

ABM hold the licence for the Matiére system in the UK and Ireland

Click here to view a YouTube video of how ABM construct a bridge in 3 days

 
Key Personnel

Main Board Directors
Pat O'Neill
Sean Minihane
Brendan O'Neill

Sustainability

ABM Europe is wholly committed to the concept of sustainability throughout all aspects of the business through the implementation of environmental...

Our Mission & Vision

ABM’s mission is to deliver exceptional quality structures, buildings and products on a continual basis that exceed our clients’ expectations...