Aston Village Educate Together School, Drogheda, Co. Louth

Project Aston Village Educate Together School, Drogheda, Co. Louth
Client Department of Education & Science
Stage Complete
Description Design & build of new school extensions comprising of 16 classrooms, a GP room, ancillary accommodation and a Special needs unit

Fact File

The design and build consortium planned a fast-track on-site construction duration of 35 weeks. This project consisted of two storey 16 classroom extensions to the existing primary school, an integrated GP Room and ancillary accommodation and a special needs unit. This was one of three school new-build contracts awarded to ABM by the Department of Education and Science under the Rapid Build Schools Programme.

Project Details

Schools in rapidly developing areas

  • The project consisted of the construction of a 16-classroom primary school building extension to the existing school.
  • The existing site encompassed an existing 8-classroom school with associated car parking and play areas. It is a self-contained area bounded primarily by residential areas and also agricultural/greenfield lands.
  • The new build comprised of 16 classrooms, a GP room, ancillary accommodation and a Special Needs Unit.
  • External works included the provision of additional car parking, turning circle, sensory garden, additional play areas and landscaping to the site.
  • The design of the extensions to the existing school both complement and facilitate the full functioning requirements of the existing buildings while complying with all aspects of the planning requirements.
  • The overall programme for the full Works, i.e. the Contract Period, was 35 weeks.
  • All civil works were carried out in accordance with The National Roads Authorities guidelines and parameters.
  • The buildings were constructed to facilitate a passive environment entailing light sensitive light fittings, excellent natural daylight, natural ventilation, air infiltration and water efficiency. The building elements were specified with a high emphasis on sustainability & efficiency
  • The Building energy rating survey resulted in the building receiving a highly sustainable building energy rating band of A3.
  • Other sustainable technology incorporated into the design was a rainwater water harvesting system. Installed to collect rainwater at roof level, the water is then fed by gravity, through a dedicated system of underground medium density polyethylene (MDPE) pipe work to a leaf filter. Leaves and other debris are passed through the storm water system and the “filtered” rainwater is passed by gravity to an underground glass rainwater holding tank. This grey water is then re-used throughout the building

The staff, pupils and parents of Aston Village Educate Together School were so delighted with their new school that they cooked and served lunch to ABM's staff and subbcontractors in the newly-built school hall.

 

 
Key Personnel

Main Board Directors
Pat O'Neill
Sean Minihane
Brendan O'Neill

Sustainability

ABM Europe is wholly committed to the concept of sustainability throughout all aspects of the business through the implementation of environmental...

Our Mission & Vision

ABM’s mission is to deliver exceptional quality structures, buildings and products on a continual basis that exceed our clients’ expectations...